CO2 stripping columns and degassing loops to maintain safe carbon dioxide levels in intensive culture.

What Problem It Solves

Elevated CO2 reduces fish appetite, impairs oxygen utilization, and causes chronic stress if not stripped from recirculated water.

Position in a RAS Flow

Between biofiltration and oxygenation stages where CO2 accumulates from respiration and nitrification.

How It Works

Water passes through degassing towers or columns where CO2 is stripped via air exchange or vacuum, lowering partial pressure before oxygenation.

Key Design Considerations

  • Size for peak CO2 production at max biomass
  • Consider building ventilation for indoor farms
  • Balance degassing with heat loss in cold climates

Common Mistakes

  • Omitting degassing in high-density fish systems
  • Undersized towers during peak feeding periods

TurnkeyRAS Integration Advantage

Degassing capacity is modeled with species tolerance limits and downstream oxygen transfer efficiency.

Technical Specifications
Technologies
Packed column, trickling, vacuum
Target parameter
CO2 partial pressure / mg/L

Related Solutions

RAS for Commercial Fish Farming

Integrated recirculating aquaculture systems for high-density grow-out of salmon, tilapia, grouper, and other commercial finfish species.

Explore Solutions

Turnkey RAS for Hot Climate Regions

Energy-efficient RAS designs for high ambient temperature and water-scarce regions, including cooling strategy, insulation, and evaporation recovery.

Explore Solutions

Related Cases

Middle EastGrouper

Hot Climate RAS Project Story

Challenge

A commercial aquaculture project in the Middle East faced extreme ambient heat, high evaporation rates, and limited freshwater availability. Traditional flow-through or pond systems could not meet biosecurity and water efficiency targets.

Solution

TurnkeyRAS delivered a chilled RAS concept with optimized insulation strategy, evaporation recovery planning, redundant oxygenation, and climate-specific automation alarms. Mechanical filtration and biofiltration were sized for peak summer loading.

FAQ

Sizing depends on feed loading, biomass, species tolerance, and hydraulic flow rate. We match module capacity to your process design.

Ask for System Matching Advice

Tell us about your species, capacity, and existing infrastructure for module matching guidance.

WhatsAppGet GuideProposal