Hot Climate RAS Project Story

Middle EastArid, high ambient temperature (>40°C summer)Grouper

Client Challenge

A commercial aquaculture project in the Middle East faced extreme ambient heat, high evaporation rates, and limited freshwater availability. Traditional flow-through or pond systems could not meet biosecurity and water efficiency targets.

Recommended System Logic

TurnkeyRAS delivered a chilled RAS concept with optimized insulation strategy, evaporation recovery planning, redundant oxygenation, and climate-specific automation alarms. Mechanical filtration and biofiltration were sized for peak summer loading.

Key Modules

Engineering Notes

  • Thermal load modeling included building envelope and tank surface area
  • Redundant oxygen supply specified for summer peak biomass
  • Automation included high-temperature and low-DO escalation alarms

Outcome / Expected Value

  • Stable water quality targets maintained under summer peak loads
  • Reduced freshwater makeup vs. semi-open alternatives
  • Predictable batch management with integrated monitoring